Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
39 lines
5.1 KiB
Markdown
39 lines
5.1 KiB
Markdown
---
|
|
name: implement
|
|
description: SDLC implementation stage. Gate on capability tags enforced in code by sdlc-gate (implement requires coding, verified against the transcript's actual model id), confirm the target branch with the user before writing any file, then claim a ready work package from ANALYZE_CONTENTS with a work ticket and complete its TDD todos one by one, updating the wiki after every item. Ends with jsc-review code-review and an optional MAINTAIN_CONTENTS entry. Use when analysis is done and code must be written; not for planning or analysis.
|
|
---
|
|
|
|
# implement
|
|
|
|
Goal: complete the analysis page's todos one by one; **update the wiki status immediately after every completed item**.
|
|
All wiki reads and writes go through `jsc-gitea:wiki`.
|
|
|
|
## Steps
|
|
|
|
1. **Model gate and stage lock** (capability tags, enforced in code — never self-assessed):
|
|
1. Run `jsc-cli/tools/model-tags.sh sync` to refresh `$JSC_HOME/model-tags.tsv` from `jsc-cli/references/model-tags.md`.
|
|
2. Run `jsc-hooks/hooks/sdlc-gate.sh lock implement`. The script reads the **actual** model id from the transcript, compares it against this stage's required tags (`coding`), and locks the stage only when they match.
|
|
3. **Never claim a capability tag you have not verified with that script**, and never substitute your own judgement for its verdict. Non-zero exit = blocked: relay the script's message verbatim, stop the skill, do nothing else this turn. Do not run `unlock` to get past the gate; only the user may decide that.
|
|
4. Exit 0 means the stage is locked. From now until the next stage's gate runs, the sdlc-gate hook blocks every prompt whose model stops satisfying the tags.
|
|
2. **Confirm the target branch** — do this **before writing any file**:
|
|
1. Report the current branch, whether the working tree is clean, and which of `origin/develop` / `origin/master` exist, plus the remote default branch resolved per `/jsc-shared:spec-git-safety`.
|
|
2. Ask per `jsc-ask:ask` rules which branch this work merges into; state the impact scope on every option (the answer decides the PR target and, when it collides with the current branch, forces a new working branch).
|
|
3. Uncommitted changes in the working tree → warn first and let the user commit or back them up; never discard them.
|
|
4. Apply `/jsc-shared:spec-git-safety` to the confirmed target: source branch and target branch sharing a name means creating a new working branch instead of committing on the target; report the resulting branch name.
|
|
5. Record the confirmed target branch on the analysis page next to the work ticket, and reuse it as the PR target in `jsc-git:pr`. Completion condition: the user has confirmed the target branch explicitly; never fall back to `develop` silently.
|
|
3. **Generate a work ticket**: format `TICKET_{yyyyMMdd}_{HHmmss}_{HASH}`. `{HASH}` = the shared wiki hash for `{owner}/{repo}`, computed by `jsc-gitea/tools/hash-id` (see `jsc-gitea:wiki`). Try to rename the current session to the ticket name (skip when the CLI does not support it).
|
|
4. Read `ANALYZE_CONTENTS` via `jsc-gitea:wiki` and list what is unfinished: plan name, HASH, work package number, count of open items. A selectable work package must satisfy all three: **unfinished, dependency-free (or all dependencies done), and not holding a work ticket**.
|
|
5. Let the user pick a work package per `jsc-ask:ask` rules (options state open-item count and estimated effort). **List handover packages (交接 `是`) first** — the analysis page ranks spec delivery ahead of implementation, so keep that order in the options. Write the ticket into that work package's ticket column (the zh-TW field 「工作證」) on the analysis page and save it back to the wiki. **Only after the ticket is saved successfully may you proceed.**
|
|
6. List every open item of the work package and implement them **one at a time**:
|
|
- Follow the TDD loop: red before green, one slice at a time; rules and anti-patterns in `references/tdd.md` (refactoring belongs to the review stage).
|
|
- After each item, flip its `[ ]` to `[x]` on the analysis page and save to the wiki before starting the next item.
|
|
7. When all items are done, call `jsc-review:code-review` and wait for the review; on failure, fix and re-review until it passes.
|
|
8. Ask per `jsc-ask:ask` rules whether to register this project for maintenance: append to `MAINTAIN_CONTENTS` with `templates/maintain-contents.md`. Required: repository `{owner}/{repo}`, maintenance method, start date. Optional: end date (NULL = maintain forever), last-maintained time.
|
|
|
|
## Rules
|
|
|
|
- The work ticket is a mutex: always skip work packages that already hold a ticket; never take one over.
|
|
- Never batch wiki updates across items; one item, one update.
|
|
- Sample data written into code or fixtures follows the analysis page's 資料來源 column: real data where a source exists, reasoned values labelled as inferred where none does. Never invent a value and present it as real, and never copy personal data into fixtures — keep the format, drop the identity.
|
|
- Everything the skill writes out (wiki content, commit messages, PR descriptions) stays Traditional Chinese per the STE100 rule.
|