What:新增 tools/stage-report.sh 與 references/stage-report.md,四支階段技能各加一步收尾回報:模型能力標籤判定、工作日誌連結、所有寫入的 wiki 連結;實作階段再加工作目錄與來源、工作、目標三條分支。 Why:階段跑完該交代什麼是固定的,寫在內文靠模型自己記,少一項看不出來。沒寫工作日誌更是如此——內容只留在對話裡,換一個工作階段就沒了。 How:彙整搬到程式層。頁名換絕對網址、commit 數與推送狀態由 git 現查、來源分支在不在遠端也由腳本判定;模型閘門那一列只轉述 sdlc-gate.sh report,不自評。沒有工作日誌就警告使用者檢查,並把內容交給 jsc-log 的暫存區,下次寫日誌一併寫入。結束碼 1 是警告不是阻擋,提前停下來也要回報。 Who:跑 SDLC 四階段的人,以及接手看紀錄的人。 Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
30 lines
4.4 KiB
Markdown
30 lines
4.4 KiB
Markdown
---
|
|
name: maintain
|
|
description: SDLC maintenance stage. Gate on capability tags enforced in code by sdlc-gate (maintenance requires no specific tag, but the actual model id must be determinable from the transcript), read projects still inside their maintenance window from MAINTAIN_CONTENTS, then run one sub agent per project: switch to develop or master, propose at least five maintenance actions, commit to a new branch, push, and PR. Update the last-maintained timestamp afterward, then close with tools/stage-report.sh - model tag verdict, worklog link, every wiki link written. Use for periodic upkeep of delivered projects inside their maintenance window; not for projects still mid-implementation or not yet registered in MAINTAIN_CONTENTS.
|
|
---
|
|
|
|
# maintain
|
|
|
|
Goal: run routine maintenance for every project in the maintenance contents page.
|
|
All wiki reads and writes go through `jsc-gitea:wiki`.
|
|
|
|
## Steps
|
|
|
|
1. **Model gate and stage lock** — run `jsc-cli/tools/model-tags.sh sync`, then `jsc-hooks/hooks/sdlc-gate.sh lock maintain`. This stage requires no specific capability tag; the gate passes as long as the script can determine the actual model id. Rules: `references/model-gate.md`. Completion condition: the script exited 0, and you have reported the stage, the required tag, the actual model id it read from the transcript, and the verdict.
|
|
2. Read `MAINTAIN_CONTENTS` via `jsc-gitea:wiki` and filter projects **still inside their maintenance window**: start date ≤ today, and (end date is NULL or ≥ today). Completion condition: you have listed every in-window project with its `{owner}/{repo}` and window dates, or reported that none is in window and stopped.
|
|
3. Every project **MUST run as a sub agent** with this flow. Completion condition: every project listed in step 2 has its sub agent finished, and each one ends in either a PR link or a recorded skip reason.
|
|
1. Run `git fetch --prune origin`, then put the project on its maintenance branch and align it with `origin/{branch}`. Which branch that is, the remote-is-the-basis rule, the diverged case and the never-pull-never-reset rule all live in `references/branch.md`; never guess the branch name. Completion condition: the project's HEAD points at the same commit as `origin/{branch}`, or you have reported the gap and skipped this project.
|
|
2. Propose **at least five** maintenance methods, then let the user pick per `jsc-ask:ask` rules — every option states its impact scope (which files it touches, whether it can break the build, how much review it costs). Candidates:
|
|
- dependency updates (reuse `jsc-pkg:pkg-update`)
|
|
- security vulnerability scan and patching
|
|
- dead code and stale comment cleanup
|
|
- test coverage reinforcement
|
|
- docs and README synchronization
|
|
- build warning elimination
|
|
|
|
Completion condition: the user has picked the methods to apply, and every picked method is either applied or reported with the reason it could not be.
|
|
3. Commit the changes to a new branch per `jsc-git:commit`, push, then open a PR per `jsc-git:pr` back to the branch of step 3.1, passing it explicitly as the base. Completion condition: the PR exists, and you have reported its URL and number.
|
|
4. Update the project's last-maintained field (the zh-TW column 「前次維護時間」) in `MAINTAIN_CONTENTS` to today. Completion condition: `MAINTAIN_CONTENTS` shows today's date in 「前次維護時間」 for that project, saved on the wiki.
|
|
4. The main agent reports the summary: maintenance methods applied per project, PR links, and failure reasons. The report and all generated wiki content, commits, and PR descriptions stay Traditional Chinese per the STE100 rule. Completion condition: the summary names every project read in step 2, each with its applied methods and either a PR link or the reason it was skipped.
|
|
5. **Stage report — the last thing this stage does, including when no project was in window.** Run `tools/stage-report.sh maintain` with one `--page MAINTAIN:{page}` per wiki page this run wrote (`MAINTAIN_CONTENTS` counts), plus `--worklog` and `--worklog-heading` when a work log entry exists. No work log yet: write this stage's log content to a file and pass `--pending-file {file} --log-hash {HASH}` so it is held for the next `jsc-log:worklog` run. Rules and exit codes: `references/stage-report.md`. Exit 1 is a warning, never a block. Completion condition: the script's output is reported to the user verbatim, and every wiki page this run wrote appears in it.
|