# CPM 甘特圖畫法
|
||||||
|
|
||||||
|
`analyze` 步驟 8 畫關鍵路徑圖時,一律照本檔語法;不得自行發明日期算法。
|
||||||
|
|
||||||
|
## 事故
|
||||||
|
|
||||||
|
`dateFormat X`(Unix 時間戳)配上天數換算出的小數(例:`1.3`、`5.0`)會讓 Gitea 的 mermaid 渲染器丟出 `Invalid date:5.0`,整張圖不顯示。原因是 `X` 格式的日期權杖只吃整數,小數的整數部分之外還剩零頭,解析失敗;即使剩的零頭是 `.0`,字串比對也對不上,一樣判定無效。**小數與 `dateFormat X` 不能同框,沒有例外。**
|
||||||
|
|
||||||
|
## 規則
|
||||||
|
|
||||||
|
1. **`dateFormat` 固定用 `YYYY-MM-DD`,不用 `X`。** 第一個工作包給一個任意錨點日期(例如 `2000-01-01`),註明「錨點日期非真實排程,只用於相對呈現」。
|
||||||
|
2. **每個工作包一個 `id`**,格式 `wp01`、`wp02`……跟編號對應,全小寫、不帶連字號(mermaid id 不吃 `-`)。
|
||||||
|
3. **時長一律用整數小時 `{h}h`,直接取 WBS 表的工時(h) 欄位**,不得把工時換算成天數小數再填進圖裡。天數換算只留在標題與 WBS 表文字,圖本身不出現小數。
|
||||||
|
4. **除了第一個工作包,其餘一律用 `after {上一個id}`** 串接,不手算累積日期。少算或算錯只會出现在這一步,串接法直接消掉這類錯誤。
|
||||||
|
5. 關鍵路徑上的工作包標 `crit`;候補(非關鍵路徑)不進這張圖,只留在 WBS 表與候補清單文字。
|
||||||
|
|
||||||
|
## 範本
|
||||||
|
|
||||||
|
關鍵路徑 `WP-02 → WP-05 → WP-09`,工時依序 10h、13h、8h:
|
||||||
|
|
||||||
|
```mermaid
|
||||||
|
gantt
|
||||||
|
title 關鍵路徑(單位:小時;錨點日期非真實排程,僅供相對呈現)
|
||||||
|
dateFormat YYYY-MM-DD
|
||||||
|
axisFormat %m-%d %H:%M
|
||||||
|
section 關鍵路徑
|
||||||
|
WP-02 {名稱} :crit, wp02, 2000-01-01, 10h
|
||||||
|
WP-05 {名稱} :crit, wp05, after wp02, 13h
|
||||||
|
WP-09 {名稱} :crit, wp09, after wp05, 8h
|
||||||
|
```
|
||||||
|
|
||||||
|
- 總天數(`= 總工時 / 8`,四捨五入到小數點後 1 位)寫進標題旁的文字或圖下方一行,不進圖本身。
|
||||||
|
- 完成條件:圖裡每個時長都是整數加 `h`,沒有任何小數;每個工作包都有 `id`;除第一個外全部用 `after`。
|
||||||
@@ -31,7 +31,7 @@ All wiki reads and writes go through `jsc-gitea:wiki`.
|
|||||||
Completion condition: every user story has reached consensus under both conditions of `references/consensus.md`, and every reuse decision — reused, or rejected with its reason — is recorded in 複用決策.
|
Completion condition: every user story has reached consensus under both conditions of `references/consensus.md`, and every reuse decision — reused, or rejected with its reason — is recorded in 複用決策.
|
||||||
6. Run a **Work Breakdown Structure (WBS)**: split the user stories into work packages, number them sequentially (`WP-01`, `WP-02`, ...) and mark dependencies. Completion condition: every user story on the plan page maps to at least one numbered work package, and every dependency edge is recorded in the WBS table's 相依 column.
|
6. Run a **Work Breakdown Structure (WBS)**: split the user stories into work packages, number them sequentially (`WP-01`, `WP-02`, ...) and mark dependencies. Completion condition: every user story on the plan page maps to at least one numbered work package, and every dependency edge is recorded in the WBS table's 相依 column.
|
||||||
7. **`WP-01` is always the delivery/handover work package** — see "Delivery package is WP-01" below. It stands alone, never merged into an implementation package, and every implementation package that consumes its spec depends on it. Completion condition: `WP-01` is marked 交付 `是` and holds only spec-shaped items, and every implementation package that consumes its spec names `WP-01` in its 相依 column — or the no-handover case below is confirmed with the user and its reason is written on the page.
|
7. **`WP-01` is always the delivery/handover work package** — see "Delivery package is WP-01" below. It stands alone, never merged into an implementation package, and every implementation package that consumes its spec depends on it. Completion condition: `WP-01` is marked 交付 `是` and holds only spec-shaped items, and every implementation package that consumes its spec names `WP-01` in its 相依 column — or the no-handover case below is confirmed with the user and its reason is written on the page.
|
||||||
8. Estimate every work package's effort in hours and days with the **Critical Path Method (CPM)**, and mark the critical path. Completion condition: every work package carries an hours figure and a days figure, and the critical path plus its total days are written on the page.
|
8. Estimate every work package's effort in hours and days with the **Critical Path Method (CPM)**, and mark the critical path. Draw the critical path as a mermaid gantt chart per `references/cpm-chart.md` — its date/duration rules are mandatory, not a suggestion; skipping them is how the `Invalid date` rendering failure happens. Completion condition: every work package carries an hours figure and a days figure, the critical path plus its total days are written on the page, and the gantt chart follows `references/cpm-chart.md` exactly (integer-hour durations, `after` chaining, no `dateFormat X`).
|
||||||
9. Split every work package into todos with **Test-Driven Development (TDD)**, formatted `[ ]` (open) / `[x]` (done). Each todo is one vertical slice: one seam, one test, one minimal implementation. Seams and anti-patterns: `references/tdd.md`. Completion condition: every work package carries at least one `[ ]` todo, and every todo names its seam and the behaviour its test asserts.
|
9. Split every work package into todos with **Test-Driven Development (TDD)**, formatted `[ ]` (open) / `[x]` (done). Each todo is one vertical slice: one seam, one test, one minimal implementation. Seams and anti-patterns: `references/tdd.md`. Completion condition: every work package carries at least one `[ ]` todo, and every todo names its seam and the behaviour its test asserts.
|
||||||
10. Apply `templates/analyze-page.md` to create or update the analysis page and write it back via `jsc-gitea:wiki`. The page content is Traditional Chinese, exactly as the template dictates. Completion condition: the page is saved on the wiki and carries every section the template dictates, including the source branch, the head sha and the 未決項 section (「無」 when there is none).
|
10. Apply `templates/analyze-page.md` to create or update the analysis page and write it back via `jsc-gitea:wiki`. The page content is Traditional Chinese, exactly as the template dictates. Completion condition: the page is saved on the wiki and carries every section the template dictates, including the source branch, the head sha and the 未決項 section (「無」 when there is none).
|
||||||
11. If the analysis page is new: add it to `ANALYZE_CONTENTS` per `templates/analyze-contents.md`, and flip the plan's status in `PLAN_CONTENTS` to the literal 「已分析」. Completion condition: `ANALYZE_CONTENTS` shows the new row and `PLAN_CONTENTS` shows the literal 「已分析」, both saved on the wiki.
|
11. If the analysis page is new: add it to `ANALYZE_CONTENTS` per `templates/analyze-contents.md`, and flip the plan's status in `PLAN_CONTENTS` to the literal 「已分析」. Completion condition: `ANALYZE_CONTENTS` shows the new row and `PLAN_CONTENTS` shows the literal 「已分析」, both saved on the wiki.
|
||||||
|
|||||||
@@ -42,6 +42,20 @@ PR 欄記錄該工作包的 PR 連結與編號;一個工作包的 PR 未合併
|
|||||||
- 關鍵路徑:{WP-01 → WP-02 → ⋯⋯},總天數 {d}
|
- 關鍵路徑:{WP-01 → WP-02 → ⋯⋯},總天數 {d}
|
||||||
- 實作候補:{WP-02、WP-03、⋯⋯}
|
- 實作候補:{WP-02、WP-03、⋯⋯}
|
||||||
|
|
||||||
|
## 關鍵路徑(CPM)
|
||||||
|
|
||||||
|
甘特圖語法固定照 `references/cpm-chart.md`:`dateFormat YYYY-MM-DD` 配任意錨點日期、每個工作包一個 `id`、時長用整數小時、除第一個外全部 `after {上一個id}` 串接。**不得用 `dateFormat X` 或把工時換算成小數天數填進圖裡**,會炸出 `Invalid date`。
|
||||||
|
|
||||||
|
```mermaid
|
||||||
|
gantt
|
||||||
|
title 關鍵路徑(單位:小時;錨點日期非真實排程,僅供相對呈現)
|
||||||
|
dateFormat YYYY-MM-DD
|
||||||
|
axisFormat %m-%d %H:%M
|
||||||
|
section 關鍵路徑
|
||||||
|
WP-01 {名稱} :crit, wp01, 2000-01-01, {h}h
|
||||||
|
WP-02 {名稱} :crit, wp02, after wp01, {h}h
|
||||||
|
```
|
||||||
|
|
||||||
## 待辦事項(TDD)
|
## 待辦事項(TDD)
|
||||||
|
|
||||||
### WP-01 {交付、交接工作包名稱}
|
### WP-01 {交付、交接工作包名稱}
|
||||||
|
|||||||