6. Run a **Work Breakdown Structure (WBS)**: split the user stories into work packages, number them sequentially (`WP-01`, `WP-02`, ...) and mark dependencies. Completion condition: every user story on the plan page maps to at least one numbered work package, and every dependency edge is recorded in the WBS table's 相依 column.
|
||||
7. **`WP-01` is always the delivery/handover work package** — see "Delivery package is WP-01" below. It stands alone, never merged into an implementation package, and every implementation package that consumes its spec depends on it. Completion condition: `WP-01` is marked 交付 `是` and holds only spec-shaped items, and every implementation package that consumes its spec names `WP-01` in its 相依 column — or the no-handover case below is confirmed with the user and its reason is written on the page.
|
||||
8. Estimate every work package's effort in hours and days with the **Critical Path Method (CPM)**, and mark the critical path. Draw the critical path as a mermaid gantt chart per `references/cpm-chart.md` — its date/duration rules are mandatory, not a suggestion; skipping them is how the `Invalid date` rendering failure happens. Completion condition: every work package carries an hours figure and a days figure, the critical path plus its total days are written on the page, and the gantt chart follows `references/cpm-chart.md` exactly (integer-hour durations, `after` chaining, no `dateFormat X`).
|
||||
9. Split every work package into todos with **Test-Driven Development (TDD)**, formatted `[ ]` (open) / `[x]` (done). Each todo is one vertical slice: one seam, one test, one minimal implementation. Seams and anti-patterns: `references/tdd.md`. Completion condition: every work package carries at least one `[ ]` todo, and every todo names its seam and the behaviour its test asserts.
|
||||
9. Split every work package into the **測試計畫(TDD)** section, formatted `[ ]` (open) / `[x]` (done). 每個待辦都是一個垂直切片:一個接縫、一個紅燈測試、一個最小實作,以及測試通過後最小的重構驗證。接縫與反模式見 `references/tdd.md`。完成條件:每個工作包都在 `## 測試計畫(TDD)` 下有自己的小節;每個實作工作包至少有一個測試先行的 `[ ]` 待辦;每個待辦都寫出接縫與測試斷言的行為。純交付工作包可以寫文件驗證或範例資料驗證待辦,但仍要寫出能證明規格可用的測試證據或審查證據。
|
||||
10. Apply `templates/analyze-page.md` to create or update the analysis page and write it back via `jsc-gitea:wiki`. The page content is Traditional Chinese, exactly as the template dictates. Completion condition: the page is saved on the wiki and carries every section the template dictates, including the source branch, the head sha and the 未決項 section (「無」 when there is none).
|
||||
11. If the analysis page is new: add it to `ANALYZE_CONTENTS` per `templates/analyze-contents.md`, and flip the plan's status in `PLAN_CONTENTS` to the literal 「已分析」. Completion condition: `ANALYZE_CONTENTS` shows the new row and `PLAN_CONTENTS` shows the literal 「已分析」, both saved on the wiki.
|
||||
12. **Stage report — the last thing this stage does, including every early stop** (the model gate blocked, the working tree did not match `origin/{source-branch}`, no plan was selectable). Run `tools/stage-report.sh analyze` with one `--page TYPE:{page}` per wiki page this run wrote — `ANALYZE_{HASH}`, `ANALYZE_CONTENTS`, `PLAN_CONTENTS`, and `REPO_{HASH}` plus `REPO_CONTENTS` when a re-inventory happened — plus `--worklog` and `--worklog-heading` when a work log entry exists. No work log yet: write this stage's log content to a file and pass `--pending-file {file} --log-hash {HASH}` so it is held for the next `jsc-log:worklog` run. Rules and exit codes: `references/stage-report.md`. Exit 1 is a warning, never a block. Completion condition: the script's output is reported to the user verbatim, and every wiki page this run wrote appears in it.
|
||||
|
||||
Reference in New Issue
Block a user