feat(pr): 統一 PR 收尾回報與留言回覆
This commit is contained in:
+2
-1
@@ -46,7 +46,8 @@ Every PR targets the next rung up. Skipping a rung is forbidden.
|
||||
- The dependency differs → run `pr-depend` as in step 8.
|
||||
- All three match → change nothing. Every needless edit notifies every reviewer, so silence is the correct outcome here.
|
||||
- Done when each of the three items is reported as either matched or updated, and the number of API calls made equals the number of items that differed.
|
||||
10. Report the PR URL, the base branch, the target branch, which of the three calibration items were updated, and the feature trunk the script auto-created when step 3 printed that line. Done when the report names all of them.
|
||||
10. If this run follows PR comment fixes and the caller supplied handled comment ids, reply to each comment now with `jsc-gitea/tools/gitea.sh comment-reply`. Rules: `jsc-meta/references/pr-report.md`. Done when every handled comment has a reply URL, or a reported reply failure reason.
|
||||
11. Report the PR with the table format in `jsc-meta/references/pr-report.md`, then report the base branch, the target branch, which of the three calibration items were updated, and the feature trunk the script auto-created when step 3 printed that line. Done when the report includes the PR table columns `{owner}/{repo}`, PR number, PR URL and PR summary, and names all branch and calibration details.
|
||||
|
||||
## Rules
|
||||
|
||||
|
||||
Reference in New Issue
Block a user